[Underfloor Heating Construction Example] PTC Pokara - New Construction Project in Koriyama City, Fukushima Prefecture
We will introduce the appearance of the kitchen flooring finish.
20 sheets of flooring have been installed in the living room, dining room, and kitchen. The flooring finishing in the kitchen area has begun, and the floor heating-specific adhesive (MD adhesive) is being applied. *MD adhesive is a solvent-free polyurethane resin-based adhesive. The flooring in the kitchen area has been completed, and the insulation and synthetic resistance value measurements after the flooring completion have also been successfully finished. *For more details, please download the PDF or feel free to contact us.
- Company:エム・ティ・ケイ
- Price:Other